0 Item

Shopping cart(0)

There are no more items in your cart
Included taxes €0.00
Total (tax incl.) €0.00

Category: Decanting assemblys

#htmlcaption1 #htmlcaption2 #htmlcaption3
Filter (5 products)

Compatible oxygen

Working pressure (b)

Price

€45.00 - €1,920.00

Prices drop

Connexion

Connexion

Height (mm)

Width (mm)

Lenght (mm)

Weight (Kg)

Material

create quotation from my cart Request a quote

This arrangement allows you to add a needle valve on decanting assembly or not equipped systems.

We use it for example upstream of our MPS booster, this allows us to balance the cylinders upstream (B50) and downstream safely, with an excellent management of the speed of transfer (always recommended 5 b/minute).

Available within 5 to 10 days
This new product is mainly designed to fulfill the requirements of professionals, instructors & live-aboard,  who have always the needs to fill several cylinders in the same time to optimize their time, decrease the generated heat by increasing the global volume, and so have better safety.
 
 
Complete mobile manifold set with 
  • Waterproof case
  • Stainless steel manifold with 4 outlets
  • DIN inlet 300b
  • Needle valve
  • Gas filter
  • Analogic or Digital gauge 
  • 4 outlets with each :
    • non return valve
    • 1 meter whip 6mm in double braided stainless steel hoses with inner Teflon (same as in C1 Expedition)
    • DIN 230/330b outlet head with valve and purge 
  • Working pressure 350b

 

 

Last items in stock
This new product is mainly designed to fulfill the requirements of professionals, instructors & live-aboard,  who have always the needs to fill several cylinders in the same time to optimize their time, decrease the generated heat by increasing the global volume, and so have better safety.
 
 
Complete mobile manifold set with 
  • Waterproof case
  • Stainless steel manifold with 4 outlets
  • DIN inlet 300b
  • Needle valve
  • Gas filter
  • Analogic or Digital gauge 
  • 4 outlets with each :
    • non return valve
    • 1 meter whip 6mm in double braided stainless steel hoses with inner Teflon (same as in C1 Expedition)
    • DIN 230/330b outlet head with valve and purge 
  • Working pressure 350b

 

 

Available in 4 to 6 weeks

Undersea decanting assembly, high-end. 

Complete options, with :
- Needle valve, 
- Non return valve, 
- 100mm 1% accuracy analogue gauge, 
- 2m charging hose.

Precise adaptor needed. standard delivery with Bullnose inlet and DIN 230 outlet.

Delivered in protection case with foam. 

Available within 5 to 10 days

Storage box for Undersea oxygen decanting assembly with foam 

Available within 5 to 10 days